Sensformer: Transformers meet connectivity

Sensformer: Born connected.
Are you ready to move into the age of connective assets? With the Sensformer, a transformer that is equipped with a connectivity feature, you can utilize the data your transformer provides to dive into digitalization and optimize your operations and business decisions. Discover the Sensformer and all the benefits Find out more about our transformers. Our iPDF takes you on a journey through the fascinating world of Siemens Transformers: Download it below to find out how we equip powerhouses in urban neighborhoods and enable the energy superhighways of the future and learn how our assets play a decisive role in the digital revolution!

New clamping concept for shunt reactors
Siemens Energy employees developed a new-to-the-world clamping concept to simplify shunt reactor design – offering tremendous benefits for production and end customers. The new concept has now been rolled out to the global shunt reactor factory network.
Direct-current electricity can now be transmitted at gigantic 1,100 kilovolts
The world´s first transformer, which has been designed and manufactured for the HVDC transmission line with the highest direct-current electricity of ± 1,100 kilovolt (kV) has been tested successfully in Nuremberg, Germany. The transformer will enable low-loss and extremely efficient high-voltage direct-current (HVDC) power transmission over a record distance of 3,284 kilometers with a transmission capacity of twelve gigawatts.
Excited? You can watch the journey of Siemens’ first 1,100 kV HVDC transformer
Part 1: The first 1100 kV HVDC transformer
Part 2: The departure
Part 3: The arrival at the port of Shanghai
Part 4: Delivery to to Guquan converter station
Find out how our innovations are shaping the future of transformers
There’s so much more to a transformer than just transforming voltage: They actually form the backbone of modern energy grids, and their reliable operation is crucial to ensuring a stable and resilient power supply.
If you haven’t had the chance to see our transformer model in person, now you can learn all about innovative transformer technology from wherever you are by watching the playouts on the right hand side.
Innovative traction transformers “Tractronic® Thinity”
Siemens presents its latest innovation highlight: The Tractronic® ThinityTM transformers will be installed in the trendsetting Siemens regional train platform Mireo®. The highly innovative transformer design results in an ultra-low weight of the infinity-symbol shaped Tractronic® ThinityTM transformer (approx. 25% less weight). The decreased weight will not only make the trains less energy-consuming. There will also be a higher capacity for passengers, monitoring equipment and passenger infotainment on board. Further benefits of the development are: more freedom of movement, shorter construction times, and optimized components – together these aspects form the truly unique Tractronic® ThinityTM transformer.
Resilience: Pretact® – React in advance
Keeping grids resilient - at any time with Siemens Energy Transformers
Reliability of energy grids is a matter that effects everybody involved in the business. Siemens Transformers offers a whole portfolio to offer grid resilience wherever needed. Our concept, named Pretact®, for resilient grids comprises a three-pillar-plan to enable our customers to prevent failures, protect their equipment and react in cases of emergency. Learn more on this topic in our infographics, use cases and collaterals. Our new concept addresses emergencies, retrofits and new installations along the entire energy value chain to increase network stability by modular feature/ solution architecture for power and distribution transformers.
Installing a mobile resilience unit within 3 days
The idea of mobile resilience units is to replace a large EHV-transformer by three compact and versatile single-phase units – either for planned or unplanned outages. The transport and installation can be completed within 30 working hours.
See in our slideshow how it works!
Our multifunction calculator checks your ideal transformer
You decided to invest in a new transformer? Using our multifunction calculator, you can check multiple basic parameters simultaneously. Does your ideal transformer meet the requirements of the European Commission’s Ecodesign Directive that has been in place since 2015*? How efficiently does it operate and how long will it take to amortize the higher investment if you decide for a more efficient variant? Take advantage of this valuable opportunity to decide and plan, step by step. Please note: Based on information on the Peak Efficiency Index, this calculator is usable only for power transformers.Find out why Siemens makes a difference
In more than 100 countries and for more than 100 years, transformers made by Siemens have been synonymous with top quality. The extreme high reliability (mean time between failures) is only one example of this quality. To ensure things stay this way, we are constantly working with high level experts on research and new developments. Furthermore, we are always close to our customers – thanks to our global manufacturing and service network. See for yourself, why our transformers make a difference!
Green Transformers with ester insulation
Synthetic and natural esters are beneficial alternatives to mineral oil as an insulating liquid in transformers. Their high flame and flash point as well as their biological degradability make them a shooting star among the cutting-edge transformer materials available nowadays. As a brand new innovation using synthetic ester, Siemens Transformers has manufactured and successfully tested three power transformers for the 400 kV-level with synthetic ester insulation and waste heat usage. Find out more about alternative environmentally friendly transformer insulation and current use cases (Zip Download)

Reliable power transmission from New Jersey to New York City
How do you provide sufficient and reliable power for a megacity like New York? Hudson Transmission Partners, LLC, awarded Siemens with the contract to connect the power supply networks of New Jersey and New York for a 660 MW back-to-back HVDC system. The challenge has been to provide a stable interconnection of two independent grids in an area with limited space and restrictive noise requirements, all within a short time. Eight Converter Transformers for HVDC Transmission helped to master this challenge and to ensure a reliable power supply for New York City.