Interval Extension - 33k Turbine Upgrade

up to
-
(1200 ES)
-
Increase in hours / starts between planned inspections
-
Reduced life cycle costs
-
Fuel Type: Dual Fuel
-
Valid for the following frames: SGT6-5000F (FC, FD, FD2, FD3, F4, F5)
Gas turbine customers continue to look for products to increase availability while reducing maintenance costs. GT Interval extension products have been specifically developed to address both these needs. Interval extension products were developed to extend the duration between planned maintenance inspection intervals, which results in increased availability and in some cases, may eliminate certain type of inspections (e.g. combustor inspections) and reduced maintenance costs.
In the example below a unit operating at 25k EBH turbine inspection intervals now operates at 33k EBH turbine inspection intervals.
This change in operation provides the following benefits:
- Same number of outages and scope but extended over 133k EBH compared to 100k EBH, helping to reduce overall maintenance costs
- Extended duration of 33k EBH between outages which can result in improved availability
- Typically, interval extension products also come with advanced Siemens technologies that can help improve performance when coupled with TPU (Thermal Performance Upgrades) products
Note: EBH = Equivalent Base Load Hours, ES = Equivalent Starts, HGP = Hot Gas Inspection, MI = Major Inspection
Key recommended interval extension products: Compressor, Combustor and Turbine
Advanced Turbine (33k EBH/ 1200 ES)
Applicable Frames: SGT6-5000F (FC, FD, FD2, FD3, F4, F5)
Fuel Type: Dual fuel
Your benefits can include
- Enhanced operation reliability
- Increase in hours / starts between planned inspections (up to 33k EBH - Equivalent Base Load Hours / 1200 ES - Equivalent Starts)
- Reduced life cycle costs
- Increased firing temperature capability (+16o F from FD2 level)
Product Features
Advanced Turbine (33k EBH/ 1200 ES) – With Performance Option
Applicable Frames: SGT6-5000F (FC, FD, FD2, FD3, F4, F5)
Fuel Type: Dual fuel
Your benefits can include
- Enhanced operation reliability
- Increase in hours / starts between planned inspections (up to 33k EBH - Equivalent Base Load Hours / 1200 ES - Equivalent Starts)
- Reduced life cycle costs
- Increased firing temperature capability (+70o F from FD2 level)
- MW improvement (up to 12MW / GT from FD2 level)
Product Features
The main product feature is the stage 1 and 2 advanced turbine F5EE hardware.
The following section highlights available recommended interval extension options for the turbine section.
For compressor and combustor interval extension products, please refer to the following:
- Interval extension products: Compressor
- Interval extension products: Combustor