Problem: High minimum loads can force costly shutdowns, leading to expensive restarts and missed dispatch opportunities.
Solution: With the Demand Response and Go-Ready upgrades, you can either remain synchronized at low loads with faster ramp capability or shut down strategically while ensuring reliability, and staying ready for fast restart when needed.