Quick ramping is a hallmark of the HL-class, achieving up to 85 MW/min and reaching full capacity in a world-record time. This performance is enabled by an optimized gas turbine design with a thermal management system and internal cooled rotor passages. This design allows for free thermal expansion during fast transients, enabling fast cold and hot starts. Alongside the SGT6‑9000HL turbine, Siemens Energy will supply an SGen6‑2000P generator and a dilution SCR system to comply with emissions regulations at Bristow Energy Center. Pending regulatory approvals and permitting, Associated expects construction to begin in 2027 with the unit commercially available in 2029.